ES Quote in 24 h
Picart stand with white lacquer and wood product displays

24–26 November 2026 · IFEMA MADRID

Your stand for Matelec 2026

We design, build and install stands for electrical and electronic solutions. 3D proposal, fixed price and on-time build-up.

The show

About Matelec 2026

Matelec is IFEMA MADRID's show for the electrical and electronics industry, with dedicated spaces for lighting and Smart Factory. In 2026 it shares dates with Genera during the International Electrification and Decarbonisation Week.

IFEMA announces more than 800 exhibitors, over 59,000 trade visitors and over 34,000 m² of exhibition space for the joint Matelec and Genera week. Official source

Installers, engineers and distributors want to see, touch and compare products. A Matelec stand works when products are well lit, within reach and clearly explained.

Ideas for your stand

What works at Matelec 2026

  • Lit product displays at hand height
  • Technical panels and screens for specs and demos
  • Stage lighting, essential if you exhibit lighting
  • Reception counter and lead capture for distributors
Picart stand with white lacquer and wood product displays
BTL stand with backlit counter, 3D logo and screen on the brand wall
Arola stand with large blue header, bar and high tables

Photos of real stands built by NUN Stands.

Timeline

Your timeline for Matelec 2026

Indicative dates for a custom stand. With a modular stand we can work to shorter deadlines.

  1. Briefing and floor plan

    as soon as possible

  2. 3D proposal approved

    by 6 October 2026

  3. Production and venue paperwork

    13 October 2026 – 19 November 2026

  4. Build-up

    days before opening, per the official build-up schedule

  5. Show

    24–26 November 2026 · IFEMA MADRID

  6. Dismantling and storage

    after the show closes

FAQ

Questions about Matelec 2026

Can you integrate powered products into the stand?

Yes. We design displays with the wiring built in and coordinate the required power with the show.

Do you also build at Genera?

Yes. Both shows run together at IFEMA MADRID and we can run both builds under one project manager.

How much lead time do you need?

Around 8-12 weeks for a custom stand and 4-6 for a modular one. If time is short, ask us anyway.

Exhibiting at Matelec 2026?

Send us your floor plan and square metres. Within one working day you get a first proposal and an indicative price.

Quote in 24 h